LECTURE 12 / 90-MINUTE LEARNING PLAN

Integrated evaluation and economics

Combine gas inventory, production, environmental constraints, and value in one decision.

All explanations and solutions are visible in this reading view. Use the interactive models to test your understanding. Reading time varies; the minute labels describe the class plan.

Integrated evaluation

00–02 min · 2 min

Make a justified development recommendation

We now combine what gas is present, what can reach a well, what environmental management is needed, and what the supplied economics support. This lecture contains the full reasoning and worked responses for the integrated project. You will test consistency between inventories and forecasts, calculate discounted cash flow, and propose the next evidence-based decision.

Conceptual teaching diagram · not to scale

Study explanation

All project data are fictional teaching inputs, not observations from an Egyptian field. The supplied storage, production, stress, and economics models are deliberately simplified. Treat their assumptions as part of the answer. A positive result in one model is not enough: the full recommendation must explain remaining uncertainty and why the exercise cannot establish reportable reserves.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1201 / 30

Learning plan

02–04 min · 2 min

Four questions organize the assessment

Ask: What gas is present? What can reach the well? What can be developed responsibly? What is commercially justified? We will review resource terminology and NPV, then work through C01–C08: free gas, adsorption, recovery, stress, production, sensitivities, economics, and the final recommendation. Every calculation includes its basis and interpretation.

Study explanation

The 90-minute plan includes a guided integrated calculation and independent checks. If studying alone, attempt each task before opening its solution. Reuse the equations explained in earlier lectures, but read the provided unit reminders so the assessment can be followed without switching files. The full project statement is also available in the reading material.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1202 / 30

Integrated evaluation

04–07 min · 3 min

Move from observations to a decision

Geology and measurements constrain storage. Pressure, permeability, connectivity, and completion behavior constrain delivery. Water, barriers, emissions, and other pathways constrain development choices. Costs, revenues, timing, and uncertainty constrain commercial value. A useful recommendation states how these lines of evidence support the next decision and which missing result could change it.

Conceptual teaching diagram · not to scale

Study explanation

Do not hide a weak assumption behind a precise-looking numerical answer. For example, an exact multiplication by an assumed recovery factor still gives a screening scenario, not demonstrated recovery. Similarly, supplied cash flows may be internally simple while omitting uncertainties that matter to a real project. Explain the model’s purpose and scope alongside each result.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1203 / 30

Prerequisite refresher

07–10 min · 3 min

Refresh the unit and mass bases

Use area in m², net thickness in m, porosity and saturation as fractions, and Bg in reservoir m³ per standard m³. Gas content is standard m³ per matching metric tonne. Standard conditions are 101.325 kPa absolute and 288.15 K. Gas equations and adsorption models use absolute pressure, with compatible pressure units.

Study explanation

A square kilometre is one million square metres. A metric tonne is 1,000 kg. Dry bulk density expresses dry rock mass per bulk rock volume; it is not grain density. Consistent porosity, saturation, and adsorption definitions are necessary before adding free and adsorbed gas inventories. The case states that its supplied definitions avoid counting the same gas twice.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1204 / 30

Integrated evaluation

10–13 min · 3 min

Gas in place is not automatically reserves

Gas in place estimates what is initially present in a defined volume. Technically recoverable quantities concern what a supported recovery concept could produce under stated technical assumptions. Reserves require a discovered accumulation and a qualifying commercial recovery project under the relevant reporting framework. A gas-volume calculation alone cannot establish that classification.

Conceptual teaching diagram · not to scale

Study explanation

The PRMS framework connects resource quantities to defined projects and commercial maturity. This lecture gives an introductory explanation rather than a formal reporting evaluation. The project has synthetic storage inputs and assumed models, but lacks the full evidence and project criteria required for reserves. Distinguish classification from uncertainty: low/base/high arithmetic scenarios are not automatically resource classes or probabilistic percentiles.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 12S1905 / 30

Integrated evaluation

13–16 min · 3 min

A recovery factor is a screening assumption here

For a screening estimate, multiply initial gas in place by an assumed recovery fraction RF. If RF = 0.25, the model assigns one quarter of the initial inventory to a recoverable scenario. That fraction does not specify production timing or independently prove that pressure, connectivity, completion, and economics allow the volume to be produced.

\[G_{\mathrm{rec}}=RF\,G_{\mathrm{in\ place}}\]

Study explanation

Recovery factors in real evaluations need technical support appropriate to the reservoir and project. In this exercise RF is an input, so report the answer as a screening result under that assumption. When the production forecast conflicts with the screening recoverable amount, investigate the conflicting assumptions rather than treating either number as unquestionable.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1206 / 30

Integrated evaluation

16–19 min · 3 min

NPV accounts for cash-flow timing

Net present value discounts future net cash flows to time zero, then subtracts the initial investment. C0 is investment today, CFy is net cash at year-end y, r is the annual discount rate, and N is the number of years. Use cash flows and a discount rate on compatible bases.

\[NPV=-C_0+\sum_{y=1}^{N}\frac{CF_y}{(1+r)^y}\]

Study explanation

A cash flow received later is divided by a larger factor when the discount rate is positive. The model therefore values timing as well as total undiscounted amounts. A positive NPV indicates that the supplied cash-flow scenario exceeds the investment at the chosen discount rate. It does not establish that the assumed production, prices, costs, or development execution will occur.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1207 / 30

Worked example

19–22 min · 3 min

Worked example: a three-year project

A fictional project costs 2.0 million currency units today and returns net cash of 0.9 million at each year-end for three years. At a 10% annual discount rate, calculate NPV. Use consistent millions throughout and discount each flow according to its year rather than discounting the total once.

Study explanation

The expression is −2.0 + 0.9/1.1 + 0.9/1.1² + 0.9/1.1³. The result is approximately +0.238167 million currency units. This is a simplified net-cash-flow exercise. A full assessment would define taxes, royalties, abandonment, price risk, and other project-specific items rather than assuming they are all known.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1208 / 30

Independent practice

22–25 min · 3 min

W12.1: apply an assumed recovery factor

A reservoir contains an estimated 300 million standard m³. An assumed recovery factor is 0.25. Calculate the screening recoverable quantity and explain why it is not automatically reserves. Include both the numerical result and the missing type of evidence, rather than simply writing that the answer is uncertain.

Study explanation

Multiplying 300 by 0.25 gives 75 million standard m³. The arithmetic does not show that a particular well plan can deliver the gas or that the project is commercial and sufficiently defined. A reserves classification requires the relevant discovered-project, recoverability, commerciality, and reporting evidence. Precision in the volume calculation cannot replace that evidence.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1209 / 30

Independent practice

25–28 min · 3 min

W12.2: a cost increase can reverse the result

In the worked project, initial investment rises from 2.0 to 2.3 million currency units. The three year-end cash flows remain 0.9 million each and the discount rate stays 10%. Calculate revised NPV and interpret whether the supplied scenario still clears the chosen discount-rate criterion.

Study explanation

The additional 0.3 million occurs at time zero, so subtract it directly from the earlier NPV. Revised NPV is +0.238167 − 0.300000 = −0.061833 million. Its sign changes even though the cash inflows are unchanged. This illustrates why a modest positive base result should be examined for sensitivity to assumptions.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1210 / 30

Integrated project data

28–31 min · 3 min

Project basis: a fictional shale block

The integrated block has area 1.0 km², net thickness 20 m, free-gas porosity 0.06, water saturation 0.30, and initial Bg = 0.005 reservoir m³/standard m³. No oil or hydrate occupies the modeled pores. These values describe the whole project area, not an individual well that should be multiplied repeatedly.

Conceptual teaching diagram · not to scale

Study explanation

All later volume and rate calculations use this same project boundary. The case supplies compatible free-phase porosity/saturation and absolute adsorption definitions so the two storage contributions do not overlap. Hold the remaining inputs fixed during the specified sensitivities. This is a learning model, not a complete representation of the geological correlations or heterogeneity in a real shale block.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1211 / 30

C01 worked solution

31–35 min · 4 min

C01: estimate initial free gas

Convert the area to 1,000,000 m². Multiply area, net thickness, porosity, and gas saturation to obtain gas-filled reservoir pore volume. Then divide by Bg to express the free-gas inventory as standard volume. Explain why the conversion changes the volume reference without creating additional gas.

\[G_f=\frac{Ah\phi(1-S_w)}{B_g}\]

Study explanation

Bulk volume is 1,000,000 × 20 = 20 million m³. Gas saturation is 1 − 0.30 = 0.70. Gas-filled pore volume is 20 million × 0.06 × 0.70 = 840,000 reservoir m³. Dividing by 0.005 gives 168 million standard m³. The two volume descriptions refer to the same free-gas amount at different reference conditions.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1212 / 30

C02 worked solution

35–38 min · 3 min

C02: convert bulk rock volume to dry mass

The supplied dry bulk density is 2,400 kg per m³ of bulk rock. Use the same area and net thickness to calculate dry rock mass, then convert kilograms to metric tonnes. This mass must match the dry bulk-rock basis of the Langmuir gas content used on the next slide.

\[M=\frac{Ah\rho_b}{1000}\]

Study explanation

Multiply 20 million m³ by 2,400 kg/m³ to obtain 48 billion kg. Divide by 1,000 kg/t to obtain 48 million metric tonnes. Do not use grain density in place of the supplied bulk density. Do not multiply by porosity again: bulk density already relates dry mass to the bulk rock volume defined by area and thickness.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1213 / 30

C02 worked solution

38–41 min · 3 min

C02: calculate adsorbed content and inventory

Use VL = 2.0 standard m³/t, PL = 5 MPa absolute, and initial pressure p = 15 MPa absolute. Calculate the equilibrium content with the Langmuir equation, then multiply by 48 million tonnes of matching dry rock. This is an absolute adsorbed inventory in the supplied additive model.

\[C_i=V_L\frac{p}{P_L+p},\qquad G_{\mathrm{ads},i}=M C_i\]

Study explanation

Content is 2 × 15/(5 + 15) = 1.5 standard m³/t. Multiplying by 48 million t gives 72 million standard m³. In real data, check absolute versus excess adsorption and the dry/moisture/ash basis, and make sure the free-gas calculation does not already assign the same gas or phase volume to another contribution.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1214 / 30

C03 worked solution

41–44 min · 3 min

C03: sum storage and apply screening recovery

The compatible free-gas estimate is 168 million standard m³ and the adsorbed estimate is 72 million standard m³. Add them to estimate total initial inventory, then apply the supplied RF = 0.25. State clearly that the recoverable number is a screening assumption and does not yet provide a production schedule.

Conceptual teaching diagram · not to scale

Study explanation

The total is 240 million standard m³. At a quarter of that inventory, screening recovery is 60 million standard m³. The model does not calculate how much surface gas is actually delivered before abandonment; that would require supported flow, operating, and economic assumptions. It also does not satisfy all formal project and reporting criteria for reserves.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1215 / 30

C04 worked solution

44–47 min · 3 min

C04: interpret depletion and effective stress

For this separate stress exercise, hold total stress at 40 MPa and α = 1. Pore pressure falls from 15 to 7 MPa absolute. Calculate initial and later effective compression, then explain a possible flow consequence. The stress calculation does not quantitatively predict fracture conductivity or fracture-initiation pressure.

Conceptual teaching diagram · not to scale

Study explanation

Initially σ′ = 40 − 15 = 25 MPa. Later σ′ = 40 − 7 = 33 MPa. Effective compression increases by 8 MPa in the stated model, potentially narrowing pores or fractures. Real depletion may change total stress as well. A stress-sensitive conductivity or permeability relationship is needed to quantify how the flow system responds.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1216 / 30

C05 worked solution

47–50 min · 3 min

C05: forecast the project rate at one year

The supplied project-wide rate model has qi = 200,000 standard m³/day and D = 0.003 day⁻¹. Use time zero at the start of this model, with no earlier production. Calculate rate at day 365. This rate already represents the whole block; do not multiply it by an invented well count.

\[q_g(365)=200{,}000e^{-0.003(365)}\]

Study explanation

The exponent is −0.003 × 365 = −1.095. The exponential remaining-rate fraction is approximately 0.334540, so q(365) is approximately 66,907.9 standard m³/day. This result follows the stipulated exponential model, not a field-derived assessment of the block. It needs a consistency check against the storage and recovery scenarios.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1217 / 30

C05 worked solution

50–53 min · 3 min

C05: accumulate the first year of production

Use the exponential cumulative expression with the day-365 rate. The result is gas produced from model day 0 through day 365. Compare it with the base screening recovery of 60 million standard m³. Agreement at this one time is a necessary consistency check, but it does not validate the models.

\[G_p(365)=\frac{200{,}000-66{,}907.9}{0.003}\]

Study explanation

Cumulative gas is (200,000 − 66,907.9)/0.003 = 44.364 million standard m³. This is below 60 million, about 73.9% of the base screening quantity. An infinite continuation of the same curve would approach 66.667 million, so a lifetime assessment would still need a finite stopping rule or revised assumptions. One-year agreement does not ensure lifetime consistency.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1218 / 30

C05 plotting guide

53–56 min · 3 min

C05: plot rate and cumulative separately

Use days 0, 90, 180, 270, and 365. Predicted rates are approximately 200,000; 152,676; 116,550; 88,972; and 66,908 standard m³/day. Cumulative gas at those times is 0; 15.775; 27.817; 37.009; and 44.364 million standard m³. Label each axis and its units.

Conceptual teaching diagram · not to scale

Study explanation

Rate should decrease smoothly while cumulative production increases with a progressively smaller slope. Make two plots rather than mixing different quantities on an unlabeled common vertical axis. Check day zero: cumulative must be zero because the problem specifies no earlier production. This shape check helps identify spreadsheet mistakes such as using a positive exponent or mixing thousands with millions.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1219 / 30

C06 low case

56–59 min · 3 min

C06: recalculate the low storage case

For the low case, change porosity to 0.04 and water saturation to 0.40. Keep area, thickness, Bg, and the 72 million standard m³ adsorbed inventory fixed. Calculate free gas, total gas, and recoverable gas at RF = 0.25. These are deterministic sensitivity inputs, not probability percentiles.

Study explanation

Gas-filled pore volume is 20 million × 0.04 × 0.60 = 480,000 reservoir m³. Divide by 0.005 to obtain 96 million standard m³ free gas. Total becomes 96 + 72 = 168 million, and the screening recoverable quantity becomes 42 million. Holding adsorption fixed isolates the requested sensitivity rather than describing every real geological correlation.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1220 / 30

C06 high case

59–62 min · 3 min

C06: compare base and high cases

For the high case, use porosity 0.08 and water saturation 0.20, leaving other inputs fixed. Gas-filled pore volume is 1.28 million reservoir m³. Divide by Bg, add the unchanged adsorption, then apply RF. Compare these answers with the base results rather than assuming a symmetric change around them.

Conceptual teaching diagram · not to scale

Study explanation

The high free-gas estimate is 1.28 million/0.005 = 256 million standard m³. Adding 72 gives 328 million total; multiplying by 0.25 gives 82 million screening recovery. The base values are 168 free, 240 total, and 60 recoverable. The cases vary both porosity and gas saturation, so the response reflects their product.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1221 / 30

C06 consistency check

62–66 min · 4 min

C06: find the inconsistent combination

The unchanged production model delivers 44.364 million standard m³ by day 365. The low-case screening recoverable amount is only 42 million. Explain why these assumptions cannot all remain a consistent recovered-production scenario. Identify what should be reassessed without declaring one uncertain input automatically correct and the others wrong.

Conceptual teaching diagram · not to scale

Study explanation

A forecast cannot produce more by one year than the scenario’s total recoverable supply. The difference is not a rounding effect. Review the storage estimate, assumed recovery factor, rate forecast, operating conditions, and abandonment/stopping rule. The exercise intentionally keeps the forecast fixed to expose this mismatch. Low/base/high cases are not P90/P50/P10 unless a probabilistic analysis establishes that interpretation.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1222 / 30

C07 economics data

66–69 min · 3 min

C07: define the independent economic scenario

The investment is 5.0 million currency units at time zero. Supplied net cash flows are 2.0 million at year-end 1, 2.5 million at year-end 2, and 2.0 million at year-end 3. Use a 10% annual discount rate. These cash flows are an independently supplied scenario already net of modeled costs.

Conceptual teaching diagram · not to scale

Study explanation

Do not derive the three-year cash flows from the one-year rate curve: gas prices, well counts, and later production schedules have not been supplied for such a derivation. The exercise deliberately separates a transparent cash-flow calculation from the production illustration. A complete real economic model would connect supported production, sales, fiscal terms, costs, and timing consistently.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1223 / 30

C07 worked solution

69–72 min · 3 min

C07: calculate base-case NPV

Discount the three supplied net cash flows separately, then subtract the initial 5.0 million investment. Work in millions of currency units throughout. Explain the sign of the result and why a modest positive base NPV should be tested against material uncertainties rather than treated as proof that development should begin immediately.

\[NPV=-5+\frac{2}{1.1}+\frac{2.5}{1.1^2}+\frac{2}{1.1^3}\]

Study explanation

The base calculation gives −5 + 2/1.1 + 2.5/1.1² + 2/1.1³ = +0.386927 million. The supplied scenario clears the 10% discount-rate criterion. Its positive margin is not very large relative to plausible changes in a fictional project’s inputs, so the specified downside cost is useful to examine. No probability of commercial success has been calculated.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1224 / 30

C07 downside solution

72–75 min · 3 min

C07: add a year-1 water-management cost

Now add 0.5 million currency units of water-management cost at the end of year 1. All other cash flows and the initial investment stay unchanged. Discount the extra cost once before subtracting it from base NPV. Explain why subtracting the full 0.5 million at time zero would use the wrong timing.

Conceptual teaching diagram · not to scale

Study explanation

The present value of the extra cost is 0.5/1.1 = 0.454545 million. Revised NPV is 0.386927 − 0.454545 = −0.067618 million. The modeled sign reverses. This is a specified deterministic sensitivity, not a forecast that the cost will definitely occur. It connects environmental management requirements to the project’s economic decision.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1225 / 30

C08 appraisal evidence

75–78 min · 3 min

C08: choose three missing measurements

A useful appraisal plan connects missing data to the uncertainty that controls the next decision. For this block, consider stress-dependent core and relative-permeability measurements, pressure/production testing, and calibrated gas-content/adsorption data. Explain which result could change the storage estimate, delivery forecast, or completion concept instead of simply requesting more data.

Conceptual teaching diagram · not to scale

Study explanation

Core and relative-permeability data help assess gas mobility under reservoir conditions. Pressure and production observations test connected supply and the plausibility of the forecast. Calibrated gas-content and adsorption measurements constrain storage and its basis. Stress/containment and water-compatibility information may also be high priorities. The best next measurement depends on the specific decision and remaining uncertainty.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1226 / 30

C08 development conditions

78–81 min · 3 min

C08: propose three environmental controls

Connect the project to a water-management plan, verified well barriers, and methane management with repair verification. For each, identify the concern, control, and supporting observation. Additional site-specific assessment may be needed for fault-related seismicity, surface disturbance, traffic, or other receptors. The fictional dataset does not supply a site-specific legal or environmental approval.

Conceptual teaching diagram · not to scale

Study explanation

A water plan should address usable supply, compatibility, treatment/handling, and destination evidence. Barrier verification should assess the intended isolation and well condition. Methane management should distinguish detection, appropriate quantification, repair, and follow-up. Controls belong in project design and cost assumptions, not only in a final paragraph after the economic calculation.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1227 / 30

C08 model recommendation

81–84 min · 3 min

C08: write an evidence-based recommendation

One supported choice is targeted further appraisal before full development. Base storage and supplied economics are encouraging, but the low storage case conflicts with the unchanged forecast and the extra water cost makes NPV negative. State what evidence must be obtained before the decision advances, and what result would lead you to stop or revise the concept.

Study explanation

Alternative recommendations can be valid if they use explicit criteria and the evidence consistently. Do not claim reserves from this exercise: demonstrated recoverability, a defined commercial project, and the relevant reporting requirements remain incomplete. A strong recommendation names the decision, its evidence, its largest uncertainty, and the next action that can reduce that uncertainty.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1228 / 30

Integrated self-check

84–87 min · 3 min

Check the whole argument

A student reports 240 million standard m³ in place, a low-case recoverable amount of 42 million, and 44.364 million produced by day 365, then recommends immediate development because base NPV is positive. Identify the unresolved contradiction and explain which additional economic result should temper the recommendation.

Which conclusion is supported by the full project exercise?

Study explanation

The storage total belongs to the base case, while the low recoverable number belongs to a different scenario. The unchanged forecast exceeds the latter. Scenarios must remain labeled and internally consistent. In addition, the specified extra water-management cost makes NPV negative. A justified recommendation must weigh these issues and missing project evidence rather than select only the most favorable number.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1229 / 30

Course review and exit ticket

87–90 min · 3 min

Complete the course with an explainable decision

You can now distinguish storage forms, interpret basic measurements, estimate free and adsorbed gas, explain flow and completion mechanisms, make a qualified forecast, evaluate pathways, and calculate simple NPV. Use those tools together: state assumptions, check units and consistency, interpret the result, and identify what evidence would change the development decision.

Conceptual teaching diagram · not to scale

Study explanation

For independent revision, redo W12.1, W12.2, and C01–C08 without opening the solutions. Check the key results: 168 million free gas, 72 million adsorbed, 60 million base screening recovery, 44.364 million first-year cumulative, +0.386927 million base NPV, and −0.067618 million downside NPV. Explain the limitations as carefully as the arithmetic.

UNCONVENTIONAL GAS RESERVOIR / LECTURE 1230 / 30

COMPLETE CHAPTER TEXT

Lecture 12: chapter notes

The original student knowledge-base chapter is reproduced below as a continuous reference, alongside the expanded explanations above.

Learning targets

Core knowledge

An engineering assessment asks four connected questions:

  1. What is present? Geology, gas storage, area, and thickness.
  2. What can reach the well? Flow paths, pressure, completion effectiveness, and interference.
  3. What can be developed responsibly? Water, barriers, emissions, siting, and monitoring.
  4. What is commercially justified? Development costs, sales conditions, operating costs, timing, and uncertainty.

A screening recovery factor gives \(G_{\mathrm{recoverable}}=RF\times G_{\mathrm{in\ place}}\). Here \(RF\) is an assumed fraction, not proof that production is technically achievable.

In resource reporting, reserves require a discovered accumulation and a defined commercial recovery project satisfying the relevant criteria. Technically recoverable gas is not automatically reserves. See the classification framework in SPE and partner societies: PRMS, revised June 2018.

For a simplified project with initial investment \(C_0\) and end-of-year net cash flows \(CF_y\):

\[ NPV=-C_0+\sum_{y=1}^{N}\frac{CF_y}{(1+r)^y} \]

\(r\) is the annual discount rate. Use cash flows and discount rates on a consistent basis. A positive modeled NPV means the modeled cash flows exceed the modeled investment at that rate; it does not remove geological or execution uncertainty.

Worked example

A fictional project costs 2.0 million currency units today and returns 0.9 million in net cash at each year-end for three years. At 10%:

\[ NPV=-2.0+\frac{0.9}{1.1}+\frac{0.9}{1.1^2}+ \frac{0.9}{1.1^3}\approx0.238\ \mathrm{million} \]

This is a simplified cash-flow exercise. A full assessment would specify items such as taxes, royalties, abandonment, and price risk.

Practice

Takeaway: A development recommendation must connect gas quantity, production behavior, environmental constraints, economics, and uncertainty.

Complete the course project →Open the course reference

LECTURE 12 · 90 MINUTES

Lecture contents

  1. 01Make a justified development recommendation2 min
  2. 02Four questions organize the assessment2 min
  3. 03Move from observations to a decision3 min
  4. 04Refresh the unit and mass bases3 min
  5. 05Gas in place is not automatically reserves3 min
  6. 06A recovery factor is a screening assumption here3 min
  7. 07NPV accounts for cash-flow timing3 min
  8. 08Worked example: a three-year project3 min
  9. 09W12.1: apply an assumed recovery factor3 min
  10. 10W12.2: a cost increase can reverse the result3 min
  11. 11Project basis: a fictional shale block3 min
  12. 12C01: estimate initial free gas4 min
  13. 13C02: convert bulk rock volume to dry mass3 min
  14. 14C02: calculate adsorbed content and inventory3 min
  15. 15C03: sum storage and apply screening recovery3 min
  16. 16C04: interpret depletion and effective stress3 min
  17. 17C05: forecast the project rate at one year3 min
  18. 18C05: accumulate the first year of production3 min
  19. 19C05: plot rate and cumulative separately3 min
  20. 20C06: recalculate the low storage case3 min
  21. 21C06: compare base and high cases3 min
  22. 22C06: find the inconsistent combination4 min
  23. 23C07: define the independent economic scenario3 min
  24. 24C07: calculate base-case NPV3 min
  25. 25C07: add a year-1 water-management cost3 min
  26. 26C08: choose three missing measurements3 min
  27. 27C08: propose three environmental controls3 min
  28. 28C08: write an evidence-based recommendation3 min
  29. 29Check the whole argument3 min
  30. 30Complete the course with an explainable decision3 min
Course project and solutions ↗

Study explanation